Calculations
You can adjust six key levers of the plan: the compute target for 2029, the purchase cost per gigawatt, the price of transitional leasing, annual operations per gigawatt, the starting payroll and the annual growth of non-compute costs.
Default settings = the note's central scenario (12 GW in 2029; Epoch AI orders of magnitude converted to euros: €33.1bn per GW purchased, €7.4bn per GW leased per year).
Annual cost 2027
€bn/yr
Cumulative 2027-2029
€bn
Compute share
%
of the 2027 annual cost
Breakdown of the 2027 annual cost
Construction (CapEx)
Transitional leasing
Operations (OpEx)
Payroll
Other costs
Blackwell-class GPUs (2029)
Installed site power in 2029 (incl. PUE)
Energy consumed in 2029
Cumulative construction (CapEx 2027-2029)
Cumulative leasing 2027-2029